Our Pool Notebook
THURSDAY, MARCH 24, 2005 Next came the plumbing. Two men came to install the PVC piping, the pump, the heater, etc. They put the pipes inside the steel frame and tested the system with air pressure before leaving. Again, everything happened in a day and things were moving along just fine. Then came April… a […]
